Box Car Project - 2003New floor arrives. Tongue and grove 2” x 8” cypress lumber. Beginning to install floor. Notches cut for bolt heads that are above sill. Floor making some progress. Flooring is held to sills by 40 penny nails. Nearing the opposite end with the floor. Last of the floor installed.
Hurricane Isabel hit Dendron in September. Although there is no damage to the boxcar there is damage to other buildings and trees that must be repaired and removed. Work is postponed on the boxcar while volunteers attend to the cleanup.
|
|