Box Car Project - 1997Trees removed and car raised 8" September 1996
The Boxcar was slowly jacked up using 12-ton hydraulic jacks. First one end was lifted about 8" and then the other, until the car had been lifted nearly 3 1/2 feet. This gave clearance enough to get a truck under the car. In lifting the Boxcar, the date November 3, 1939 was found on the top of one of the pillars. ![]() Car with 1" pipe 'rollers' under it. Car had to be shifted 6" left so it would clear a large tree on the right side when it was jacked up for loading. September 1996. ![]() 6"x6" timber used inside of car for additional support during lifting and moving. The condition of the center required additional support. September 1996. ![]() Inside of car with additional 6"x6" timber attached to the needle beams below the car. September 1996. ![]() Boxcar completely jacked up and ready to be moved. Center supports were removed just as the truck arrived. April 1997. ![]() Boxcar jacked up sitting on blocks ready to be moved. April 1997. ![]() Boxcar jacked up before moving. Truss rods are visible under the car. Also rear areas damaged by years of water. April 1997. |
|
| Please contact
the Webmaster with comments
or questions about the site. Page last modified: January 13, 2003 |